Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ROLLER PAD INSTALLATION SEQUENCE CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Assembly of Minor Components
Up
TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Next
Turning the Platform Assembly

                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-20 CAUTION Use of a pry-bar should not be necessary during the initial assembly of the Dual Row platform.  If using a pry bar to install the link on an assembled platform, exercise extreme caution to avoid bowing or bending the side rail. (b)  Each link slides into the groove between the platform rail and the platform panel end.   Use a pry-bar if necessary to open the groove as the link is inserted. (c)   Slide link forward until its bolt-holes are matched up with platform clevis bolt-holes 31 through 34. (d)  Install four ½-inch X 3 7/32-inch side rail bolts, and ½-inch flat washers, on each side of the platform into clevis bolt-holes 31 through 34 and corresponding holes in the fitting.   Install the two remaining side rail bolts (35 and 36), washers and bushings.  Tighten the hex head bolts two or three turns by hand. BOLT HOLES 31-34

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing