Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ROLLER PAD INSTALLATION SEQUENCE FIG.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ROLLER PAD INSTALLATION SEQUENCE CONT.
Up
TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Next
Assembly of Minor Components

                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-18 (9) Position a side rail (1) along each edge of the platform overlapping the outboard roller pad. Use a punch to align the bolt-holes.  Install 3/8-inch x 1¼-inch hex head bolts (2) with 3/8- inch flat washers (3) through the side rail and the roller pad into the captive nuts (4).  Start the bolts two or three turns by hand. (10)   Repeat step (9) above with another side rail of equal length on the opposite side of the platform. NOTE No bolts can be missing from the extreme forward and rear platform panel edges. (11)   Using an impact wrench with a 9/16-inch socket, tighten all roller pad bolts (1) installed in the two in board roller pads (as shown in the diagram below). (12)   Using an impact wrench with a 9/16-inch socket, tighten the roller pad bolts (2) and (3) to within one-quarter inch of the top of the flat washer.  This will ensure that the side rails are securely attached.  DO NOT fully tighten these bolts at this time.  Refer to the illustration below for bolt locations. OUTBOARD ROLLER PAD NUT RETAINER ASSEMBLY (PORTION OF PANEL ASSEMBLY NUT BAR USED TO CONTAIN THE CAPTIVE NUTS) 4 1 3 2 2 3 1 SIDE RAIL BOLT INSTALLATION           SEQUENCE 1ST – ALL INBOARD ROLLER            PAD BOLTS 2ND – BOLTS ON INSIDE OF          OUTBOARD ROLLER PAD 3RD – BOLTS ON OUTER SIDE          OF OUTBOARD ROLLER          PAD 3 1 2 ROLLER PAD INSTALLATION SEQUENCE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing