Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ROLLER PAD INSTALLATION SEQUENCE CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ROLLER PAD INSTALLATION SEQUENCE CONT.
Up
TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Next
ROLLER PAD INSTALLATION SEQUENCE CONT.

                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-14 CAUTION The platform weighs approximately 89-pounds per foot of length.   To avoid injury to personnel or damage to surrounding equipment, use extreme caution when lifting and handling.  Never walk near or crawl beneath the assembled raised platform.  Be careful not to damage the side rail notches when turning-the platform over.  Short pieces of plywood should be used to prevent the edges of the rail from contacting a concrete floor or other hard surface. c.    The steps required for the assembly of the major components of the dual row airdrop platform are as follows: (1) Construct a flat structure of sufficient mass and strength to support the weight of the platform at a safe, convenient work height.  Ensure that the surface design allows for the clearance of the tie down rings.  Ensure that the structure is a minimum 18-feet long and 72 to 75-inches wide.  This size allows each panel surface to lay flat and helps to keep the assembled platform flat. NOTE The dual row airdrop platform must be assembled upside down.   Roller pad bolts are installed through the roller pad and side rails into the bottom of the panels.  Riveted-nut plate bars are located inside the panels. Approximately 24-Inch Working Height

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing