Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ROLLER PAD INSTALLATION SEQUENCE CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ROLLER PAD INSTALLATION SEQUENCE
Up
TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Next
ROLLER PAD INSTALLATION SEQUENCE CONT.

                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-9 (14)   Install a tandem link assembly at each end of the side rail by sliding them within the side rail aligning the bolt holes on the tandem link with the last three holes at the end of each the side rail.  Install ½-inch X 3 7/32-inch side rail bolts (2) with ½-inch flat washers (3).   Bolts should be left finger tight. NOTE Ensure all side rail bolts, washers, and bushings are installed. (15)   Draw the side rail into proper alignment by fully tightening the forth bolt from each end of both side rails, using a ¾-inch socket or wrench.  All other side rail bolts may then be tightened, working from the center toward each end of the platform.  Refer to the figure below for details. FIRST MAIN PANEL IN SERIES OUTBOARD ROLLER PAD 1 2 SIDE RAIL 3 SECOND MAIN PANEL IN SERIES

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing