Click here to make tpub.com your Home Page

Page Title: ASPSU alinement preparation (Cont).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ASPSU alinement preparation (Cont).
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
ASPSU alinement check.

TM 10-1670-265-12&P
T.O. 13C7-1-12
4-18. ASPSU - Aline (Cont)
4-18
ALINEMENT (Cont)
2.
ASPSU alinement preparation (Cont).
d.
Loosen two small screws with your cross tip screwdriver and swing cover open to expose test connector.
e.
Connect the test set cable furnished with the test set.
NOTE
The mated connector must be properly alined with the connector in the ASPSU.
f.
Close the pressure chamber door.
g.
Set altitude barometric setting to 29.92 inches of mercury.
GO TO NEXT PAGE
4-36

Privacy Statement - Press Release - Copyright Information. - Contact Us