Click here to make tpub.com your Home Page

Page Title: ALINEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ASPSU - ALINE
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
ASPSU alinement preparation.

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-18. ASPSU - Aline (Cont)
4-18
ALINEMENT (Cont)
NOTE
The following step-by-step instructions cover the alinement of the ASPSU. However, if you have
been performing an operational test and have been referred to this paragraph for an alinement,
you are to proceed from step 4 below.
1.
Test set preparation.
a.
Electrical hookup. Remove and connect the 115 VAC power cable in the ASPSU test set in accordance with
TM 10-1670-266-13&P.
NOTE
Insure that all test set switches are in the OFF or DOWN position.
b.
Raise the pressure chamber door.
c.
Check fuses and lights in accordance with TM 10-1670-266-13&P.
GO TO NEXT PAGE
4-33

Privacy Statement - Press Release - Copyright Information. - Contact Us