Click here to make tpub.com your Home Page

Page Title: ASPSU test shutdown.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Testing (Cont).
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
ASPSU - ALINE

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
3. Destructive test procedure (Cont).
d. ASPSU test shutdown.
(1) Place PUMP switch to the off position.
(2) Place PRES. DUMP switch (8) to the up
position.
(3)  Place AC POWER switch to the OFF
position.
WARNING
Always  insure  that  the  ASPSU  test  set  is
depressurized before attempting to open chamber
door as personnel injury may result.
(4)
Raise the ASPSU test set pressure chamber door.
(5)
Disconnect the vacuum cylinder rod from the arming cable.
(6)
Lift the ASPSU from the test set.
(7)
Remove nylon webbing from chamber and inspect the severed ends for a completed, unfrayed cut.
e. Test set shutdown.
(1) Close the ASPSU test set pressure chamber door.
(2) Disconnect the 115 VAC power cable from the ASPSU test set and stow in accordance with TM 10-1670-
266-13&P.
(3) Stow mounting brackets in accordance with TM 10-1670-266-13&P.
END OF TASK
4-31

Privacy Statement - Press Release - Copyright Information. - Contact Us