Click here to make tpub.com your Home Page

Page Title: Testing (Cont).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Testing.
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
ASPSU test shutdown.

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
3. Destructive test procedures (Cont).
c. Testing (Cont).
NOTE
The following step activates the thermal battery which will supply power to the ASPSU for only
116 seconds. Step 7 below must be accomplished within 115 seconds after arming the ASPSU.
(6) Place the ASPSU ARM switch in the up position. Verify that the arming cable has been pulled out from the
ASPSU approximately 1 inch.
(7) Place the ALT. DECR. switch (7) in the up
position.
(8)  Observe altimeter as it approaches the
firing altitude of the specified drop zone and note when
the ASPSU fires.
(9)  If cutter fails to fire, report failure to the
appropriate agency.
GO TO NEXT PAGE
4-30