Click here to make tpub.com your Home Page

Page Title: ASPSU test shutdown.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
HIGH PRESSURE READING
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
Destructive test procedure.

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
2. Operational test procedures (Cont.
d. ASPSU test shutdown.
(1) Return ASPSU TEST switch (6) to the OFF
position. Turn PUMP switch (3) to the off position.
(2) Place PRES. DUMP switch (12) to the up
position to depressurize chamber.
(3) Place AC POWER switch (1) to the OFF
position.
WARNING
Always  insure  that  the  ASPSU  test  set  is
depressurized before attempting to open chamber
door as personnel injury may result.
(4) Raise the ASPSU test set pressure chamber
door.
(5)  Return ALT.  DECR.  switch (11) to the
down position. Place the PRES. DUMP switch (12) to
the down position.
(6)  Disconnect the test set cable from the
ASPSU and the test set.
(7) Close test connector cover on ASPSU and
tighten two screws.
(8) Lift ASPSU from test set.
(9) Tag the ASPSU or defective modules in
accordance with TB 750-126.
e. Test set shutdown.
(1) Close the ASPSU test set pressure chamber door.
(2) Disconnect the 115 VAC power cable from the ASPSU test set and stow in accordance with TM 10-1670-
266-13&P.
(3) Stow the test set cable in accordance with TM 10-1670-266-13&P.
END OF TASK
4-24

Privacy Statement - Press Release - Copyright Information. - Contact Us