Click here to make tpub.com your Home Page

Page Title: LOW PRESSURE READING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
TESTING (Cont)
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
HIGH PRESSURE READING

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
2. Operational test procedure (Cont).
c. Testing (Cont).
LOW PRESSURE READING
(9) Return ASPSU TEST switch (6) to the OFF
position. Turn PUMP switch (3) to the off position.
(10) Place PRES. DUMP switch (12) to the up
position to depressurize chamber.
(11) Place AC POWER switch (1) to the OFF
position.
WARNING
Always  insure  that  the  ASPSU  test  set  is
depressurized before attempting to open chamber
door as personnel injury may result.
(12)
Raise the ASPSU test set pressure
chamber door.
(13)  Return ALT. DECR. switch (11) to the
down position. Place the PRES. DUMP switch (12) to
the down position.
(14)
Set BARO. PRES. switch on ASPSU to
29.5.
(15) Close the pressure chamber door.
(16)  Repeat steps cl through c9 above and
record the altitude at which the FIRE indicator lights.
NOTE
Fire altitudes and recorded data will reflect a difference
in altitude relative to the initial altitude checks.  This
difference should correspond directly to the difference
between 29.9 and 29.5 inches of mercury or an increase
in FIRE altitude of +400'±250'for altitudes of 9,900' to
5,000' and +400' ±150' for altitudes of 4,900' to 100'.
GO TO NEXT PAGE
4-22

Privacy Statement - Press Release - Copyright Information. - Contact Us