Click here to make tpub.com your Home Page

Page Title: TESTING (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
TESTING (Cont)
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
LOW PRESSURE READING

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
2. Operational test procedures (Cont).
c. Testing (Cont).
(6) The IGN CHECK red light (9) should be on. This verifies that the cutter ignition circuit is complete.
(7) If the IGN CHECK fails to light the cutter is bad and must be replaced. To remove the ASPSU from the
tester, proceed to step d. Replace unserviceable cutter and repeat paragraphs 4-16 and 4-17.
(8) Observe altimeter and FIRE indicator (10). Place ALT. DECR. switch (11) to up position, read and record
the altitude at which the FIRE indicator lights. If the FIRE indicator lights within following tolerances, it may be used.
Dz Firing Altitude
Fire Altitude Tolerances
9,900 feet
±250 ft.
9,000 feet
±250 ft.
7,000 feet
±250 ft.
5,000 feet
±250 ft.
3,500 feet
±150 ft.
1,000 feet
±150 ft.
Further readings as follows, are required to assure that the bellows are adjusting to various barometric pressure changes.
GO TO NEXT PAGE
4-21

Privacy Statement - Press Release - Copyright Information. - Contact Us