Click here to make tpub.com your Home Page

Page Title: TESTING (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
TESTING (Cont)
Up
TM-10-1670-265-12-P Tools List for High Altitude Airdrop Resupply System: 2 000 Pound Capacity Manual
Next
TESTING (Cont)

TM 10-1670-265-12&P
T.O. 13C7-1-21
4-17. ASPSU - Test (Cont)
4-17
TESTING (Cont)
2. Operational test procedures (Cont).
c. Testing.
(1) Place the AC POWER switch (1) on the test
set to the ON position. The PILOT light (2) should come
on.
(2) Place PUMP switch (3) to the ON position.
(3)
Place ALT.
INCR.
switch (4) in the up
position.
NOTE
If altimeter fails to rise, apply light hand pressure to
the chamber door.
(4)  Observe altimeter (5).  When altimeter
reaches 10,000 feet, place ALT. INCR. switch in the
down position.
(5) Place ASPSU TEST switch (6) to the ON
position.  Both the green RUN light (7) and POWER
SUPPLY  CHECK  light  (8)  should  come  on.
GO TO NEXT PAGE
4-20

Privacy Statement - Press Release - Copyright Information. - Contact Us