Click here to make tpub.com your Home Page

Page Title: Figure 1-4. Log record entries for the modification work order compliance page.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 1-2. Parachute log record entries for the inside front and back covers, typical
Up
TM-10-1670-201-23 General Maintenance of Parachutes and Other Airdrop Equipment Manual
Next
Parachute harness log record.

TM 10-1670-201-23
T.O. 13C-1-41
NAVAIR 13-1-17
the "MODIFICATION WORK ORDER COMPLIANCE
1. Date.
Enter the date (day,
RECORD" page of the log record (fig. 1-4).
month, and year 1 of each inspection and packing action
applied to the parachute.  These actions include the
initial pack (1 , after-use repack, 120-day inspection and
repack, and routine inspection (2), as applicable.
2. Bag number. If the parachute is
of troop-type design, enter the deployment bag number
which is marked on the bag suspension line protector
flap.
3. Routine inspection.
Enter a
checkmark  when  an  emergency-type  personnel
parachute is administered a routine inspection.
4. Jumped or dropped. No entry
required.
5. Repack.
For initial packing,
enter "in.", thereafter enter a checkmark in the column
each time the parachute is repacked.
Figure 1-4. Log record entries for the modification
6. Packer's name.
The packer
work order compliance page. typical
performing the initial pack, repack, or routine inspection,
(d) Organizational,  field,  and  depot
as applicable will sign this entry.
repair and inspection data page.  When a parachute
7. Inspector's
name.
The
canopy assembly is initially received from a supply
inspector who has performed the pack-in-process
source and a technical/ rigger-type inspection is
inspection or routine inspection, as applicable, will sign
performed, the inspection accomplishment will be
this entry.
documented on the "ORGANIZATIONAL, FIELD, AND
8. MWO  number.
Enter  the
DEPOT REPAIR AND INSPECTION DATA" page of the
publication number and date of the modification work
individual parachute log record (1, fig. 1-5). Additional
order (MWO) which prescribes the modification work ( 1,
entries will also be made on this page each time the
canopy assembly is repaired (2, fig.
1-5) or is
9. MWO title.
Enter a short,
administered an inspection in compliance with a one-
abbreviated title extracted from the modification work
time inspection technical bulletin (TB) (3, fig. 1-5). The
order (MWO) prescribing the work.
page completion criteria is as follows:
10. Modified by.
Enter the last
name of the individual who has performed the
modification. If the original log record for the parachute
has been lost and it has been ascertained through
inspection that a particular modification has been
accomplished, the entry for this column will be "C / W "
(2, fig. 1-4) which signifies the applicable modification
work order (MWO) has been complied with.
11. Inspected by.  The individual
who  accomplished  the  inspection  required  after
modification will sign this entry with his last name only.
12. Unit. Enter the unit designation
responsible for performing the modification work or. in
the event of a lost log record, the unit to which the
inspector is assigned.
Figure 1-5. Log record entries for the
organizational, field, and depot repair and
13. Date.
Enter the date (day,
inspection data page. typical
month, and year) the modification work was completed.
14. Unit. Enter the unit designation
to which the packer and/ or inspector are assigned,
(c) Modification work order compliance
record page. When a modification is performed on a
parachute canopy, the following entries will be made on
Change 4
1-5

Privacy Statement - Press Release - Copyright Information. - Contact Us