TM 9-4910-609-14&P
1.8
List of Items Furnished
The RM-77 consists of five (5) major assemblies.
Parts List #77003).
List of Items Required for Installation
1.9
To install the Maintenance Fixture, the following
parts are required:
There are two ways of mounting.
Either use:
A.
4 ea 1/2" dia. bolts of sufficient length, with associated washers;
OR
4 ea 1/2" N.C. studs embedded in 4" concrete.
Locate studs per
Fig. 2,
when pouring new base.
A 1/4" NPTN with flexible or rigid lines, for connection to the
B.
inlet port.
1.10 Storage Data
No special instructions are required for storage, other than the usual
lengthy periods of time.
1.11 Tools and Test Equipment
No special tools or test equipment are required.
3