TM 9-2330-246-14
4-119. AIR CONDITIONER REPLACEMENT (M373A3, M373A4, AND M373A5).
This Task Covers:
Installation
a.
Removal
b.
Initial Setup:
Equipment Conditions:
Materials/Parts:
Z 110-volt power disconnected from semitrailer.
Tools/Test Equipment:
Six rivets
General mechanic's tool kit
Seventy Iockwashers
Drill bit set
Electric drill
References:
Z Fork lift
Rivet gun
TM 5-4120-259-15
REMOVAL
a.
1.
Open and secure access panel (4).
2.
Remove six rivets (8) and two filter assemblies (7) from air conditioner (l). Discard rivets.
Remove 20 screws (6) and Iockwashers (5) securing boot and frame assembly (9) to access opening. Discard
3.
Iockwashers.
4.
Remove 50 screws (3) and Iockwashers (2) securing boot and frame assembly (9) to front of air conditioner(l).
Remove boot and frame assembly. Discard Iockwashers.
4-284