TM 9-2330-211-14&P
4-14. WIRING HARNESS
This Task Covers:
b.
Installation
Removal
a.
Initial Setup:
Tools/Test Equipment:
Equipment Conditions:
Chisel
Extension, 6 in. long, in. drive
Materials/Parts:
Pliers, slip-joint
Screwdriver, flat-tip
Socket,
in., in. drive
Personnel Required: Two
Wrench, open-end,
in.
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
Using screwdriver,
in. socket,
in. extension,
Four nuts (1),
1.
Cover (9) and
and in. handle, unscrew and take out.
receptacle
Iockwashers (2),
ground wire (3),
assembly (10) to
semitrailer (4)
and screws (8)
Pull away from semitrailer (4) and separate.
Cover (9) and
2.
Front of
semitrailer (4)
receptacle
assembly (10)
in. wrench and flat-tip screwdriver,
Using
Two nuts (15),
Under right side
3.
unscrew and remove.
Iockwashers (14),
of gooseneck (17),
two clips (13)
and screws (12)
Spread and remove.
Two clips (13)
4.
Wiring harness (11)
4-28