| |
Back REQUISITION SYSTEM DOCUMENT (MANUAL), DD 1348 - CONTINUED | Up Hospital Corpsman 1 & C - Advanced Navy Nursing manual for hospital training purposes | Next REQUISITION SYSTEM DOCUMENT (MANUAL), DD 1348 - CONTINUED |
numbers specify Navy Stock Account (NSA)
materiel, and even numbers specify either Ap-
propriation Purchases Account (APA) materiel
or nonstores account materiel. The second
character of the symbol indicates the cognizant
inventory manager and is entered in CC 56. For
example, if the cognizance symbol is 9N, it
appears in the distribution field as illustrated
here.
When the cognizance symbol is not known and
the fund code cited does not signify a charge to
an allotment under NSF, leave CCs 55-56 blank.
If the fund code cited signifies a charge to an allot-
ment under NSF, enter a cognizance symbol
compatible with the fund code. For example, a
USS John Paul Jones (DDG-32) requisition citing
fund code NR, for a machinery repair part
that cannot be identified to NSN, does not
require you to enter a cognizance symbol in
the distribution field. However, a USS Puget
Sound (AD-38) requisition citing fund code
CZ for the same item would have the
cognizance symbol entry 1H in CCs
55-56. Entries would appear as shown in figure
12-5.
CCs 57-59, PROJECTThe project code is
a mandatory three-character entry (fig. 12-6)
used to identify the purpose of the requirement.
These codes are recognized throughout the
distribution system and assist the supplier in
determining the appropriate method of handling
and marking of shipments. The third position of
the project code may be used to provide the sixth
digit of a storage location if needed. See
appendix 6 of NAVSUP P-485 for a complete
listing of codes.
CCs 60-61, PRIORITYThis is a numeric
code assigned by the requisitioner that indicates
the mission of the requisitioner and the urgency
of need for the materiel. PD is assigned according
to the procedures explained earlier in this
chapter.
Figure 12-5.-Data blocks illustrating cognizance symbols
for fund codes NR and CZ.
Figure 12-6.-Data block with project code entry.
12-19
|