Figure 3-30. Output filter.
Up
TM-11-6130-385-34 Inverter Static Power PP-7274/A (NSN 6125-00-148-8342) and PP-727 4A/A (NSN 6130-01-093-3077) Manual
Next
Load Test Procedure

TM
11-6130-385-34
Section X. UNIT TESTING PROCEDURES
3-41. General
3-42. Test Equipment Setup
CAUTION
a. Preliminary Setup.
( 1 ) Connect dc power supply to unit under test.
The procedures in this section are to be
( 2 ) Apply power to all test equipment.
p e r f o r m e d only after preceding sections of
( 3 ) Adjust each phase load to zero.
this chapter have been performed. This will
(4) Insure that the load is Y-connected.
prevent further damage to other faulty
b. Setup Limits and Recording Accuracy.
c i r c u i t s that may be present in a unit not
±.1v.
(1) Ac and dc volts.
troubleshooting
processed
through
±3.75 w.
( 2 ) Ac power
procedures.
±.1  A.
(3) Dc
T h i s section covers testing procedures for use by
±  Hz.
( 4 ) Frequency
d i r e c t support maintenance personnel to determine
Preset.
( 5 ) Power factor
w h e t h e r the performance of repaired equipment is
Nearest .1%.
( 6 ) Distortion
s a t i s f a c t o r y for return to users. See table 3-5 and
Nearest .1%.
( 7 ) Efficiency
figure FO-8 for test setup. Use figure 3-31 for
c. Performance Tests. Record required readings as
distortion testing. Testing shall be in the order given
shown on table 3-9. This form, if used, must be
in this section to insure a logical, sequential method
p r e p a r e d by the maintenance technician.
of testing. Table 3-8 sets forth the order of procedure
to insure conformance with the specified parameters.
Data may be reocrded on form as shown in table 3-9.
Trimmer
fixture
NOTE
3-43. No-Load Test Procedure
The wattmeter and monitor selectors are
a. Set equipment as follows:
changed as required to monitor or adjust the
0.
(1) Load settings
particular parameter being tested.
No load.
(2) Load function
b. Observing the direct current, turn the dc power
(3) Wattmeter selector