Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: RESERVOIR TANK
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 1-1730-231-13&P 3-30.  RESERVOIR TANK 3-30 This task covers: A.  INSPECTION B.  REPAIR (AVIM) C.  REMOVAL D.  INSTALLATION INITIAL SETUP Tools Tool Kit, Hydraulic, NSN 5180-00-323-4891 Shop Set, AVIM, Hydraulic, NSN 4920-00-165-1454 Parts Required Gasket, P/N 20079-03 Personnel Required MOS 67 General Safety Instructions WARNING Be sure that all electrical power is removed from the    unit    before    beginning    any    maintenance operation. To  avoid  personnel  injury,  the  pump  must  be shut  down  before  beginning  any  maintenance operation. NOTE Tag all disconnected tubing to ease reinstallation. A. INSPECTION 1. Check fluid level to make sure it is to the center of the OPNL LEVEL sight glass (1). 2. Check all tubing and line connections for leaks. 3. Check reservoir tank (2) for physical damage. GO TO NEXT PAGE 3-42

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business