Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: GENERAL INSPECTION AND SERVICING INSTRUCTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER 3 UNIT MAINTENANCE
Up
TM-9-2320-362-14P Truck Tractor M1070 8 x 8 Heavy Equipment Transporter (HET) Manual
Next
GENERAL  SERVICE  AND  INSPECTION  PROCEDURES

3-7. 3-8. TM 9-2320-362-14&P 3-6. GENERAL  INSPECTION  AND  SERVICING  INSTRUCTIONS a. See  Chapter  2  of  this  manual  when  checking  equipment  for  proper operation. b. For  all  services  and  inspections,    follow  operator  PMCS  procedures given in Chapter 2 of this manual. Section IV. UNIT PREVENTIVE MAINTENANCE CHECKS AND  SERVICES  (PMCS) The best way to maintain the components of the EES kit covered by this manual is to inspect them on a regular basis so minor faults can be dis- covered  and  corrected  before  they  result  in  serious  damage,  failure,  or injury. This section contains systematic instructions for inspection and correction  of  the  EES  kit  components  to  avoid  costly  repairs  or  major breakdowns. This  is  Preventive  Maintenance  Checks  and  Services  (PMCS). a. Unit  maintenance,   assisted  by  operator/crew,  will  perform  checks  and services  contained  in  table  3-1  at  the  following  intervals: (1)  Semiannually  (S). Every 6 months or 3,000 miles (4,827 km), whichever  comes  first. (2) Annually (A). Every 12 months or 6,000 miles (9,654 km), whichever  comes  first. (3)  Biennially  (B). Every 24 months or 12,000 miles (19,308 km), whichever  comes  first. b. Perform  all  (S)  inspections  in  addition  to  (A)  inspections  at  the time of the annual inspection. Perform  all  (A)  and  (S)  inspections  in addition to (B) inspections at the time of the biennial inspection. 3-9.  REPORTING  REPAIRS All shortcomings of the components of the EES kit will be reported on DA Form  2404  (DA  Pam  738-750),  Equipment  Inspection  and  Maintenance  Worksheet, immediately after the PMCS,    and  before  taking  corrective  action. All deficiencies of the components of the EES kit will be reported in the equipment  record. 3-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing