Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TUNNEL INTERIOR SIDE INSULATION REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
RIGHT FRONT COWL INSULATION REPLACEMENT
Up
TM-9-2320-280-20-3 Truck Utility Cargo/Troop 1-1/4 Ton 4x4 Manual
Next
TUNNEL INTERIOR SIDE INSULATION REPLACEMENT FIG.

TM 9-2320-280-20-3 10-28. TUNNEL INTERIOR SIDE INSULATION REPLACEMENT This  task  covers: a.  Removal b. Installation INITIAL  SETUP: Tools Equipment  Condition General  mechanic’s  tool  kit: s  Left  front  cowl  insulation  removed  (para.  10-26). automotive  (Appendix  B,  Item  1) l Front  floorboard  removed  (para.  11-154). Manual  References TM   9-2320-280-24P NOTE Removal  and  installation  procedures  for  all  tunnel  interior  side insulation  are  basically  the  same.  This  procedure  covers  the  left front  insulation. 1. Remove two screws (4) from retaining rod (5) and cargo floor (6). 2. Remove two screws (2) from retaining rod (3) and cargo floor (6). 3. Remove three screws (1) and retaining rod (8) from tunnel (7) and cargo floor (6). 4. Remove two screws (9) from retaining rod (10) and tunnel (7). 5. Remove two screws (14), retainer (12), and insulation (11) from floor (13). 6. Remove retaining rods (3), (5), and (10) from insulation (11). b.  Installation 1. Install retaining rods (10), (3), and (5) on insulation (11). 2. Position insulation (11) into place against floor (13), tunnel (7), and cargo floor (6). 3. Install insulation (11) and retainer (12) on floor (13) with two screws (14). 4. Install retaining rod (10) on tunnel (7) with two screws (9). 5. Install retaining rod (8) on tunnel (7) with three screws (1). 6. Install retaining rod (3) on cargo floor (6) with two screws (2). 7. Install retaining rod (5) on cargo floor (6) with two screws (4). 10-48

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing