Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Primary Method. Eddy Current.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-8.  Antiflap Bracket
Up
TM-1-1520-265-23 H-60 Helicopter Series Manual
Next
2.9.3.6 Inspection Procedure

TM 1-1520-265-23 2.9.3  Primary Method.  Eddy Current. 2.9.3.1 NDI Equipment and Materials.  (Refer to Appendix B.) a. Eddy Current Inspection Unit b. Probe, straight, shielded surface, 100 KHz-500 KHz c. Probe, right angle, shielded surface, 100KHz-500 KHz, 90°  1/2 inch drop d. Cable Assembly e. Reference Block, three-notched aluminum (0.008, 0.020, 0.040 EDM notches) f. Teflon Tape, refer to Table 1-8 g. Aircraft Marking Pencil, refer to Table 1-8 2.9.3.2 Preparation  of  Helicopter.    The  helicopter  shall  be  prepared  for  safe  ground  maintenance.    A  partial inspection for cause (visual indications, sites of mechanical damage, corrosion, etc.) may be performed on all exposed surfaces  of  the  installed  part  using  this  procedure.    If  required,  the  droop  stop  support  ring  nut  shall  be  removed  in accordance with the applicable technical manuals listed in Table 1-1. 2.9.3.3 Access.  Access to the droop stop support ring nut is from the UR engine cowl (Figure 1-4, Items 3T-7 and 4T-8). 2.9.3.4 Preparation of Part.  The part shall be thoroughly cleaned.  Refer to Preparation of Part or Area for NDI, paragraph 1.4.4. 2.9.3.5 NDI Equipment Settings. a. Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-1 9ell. Frequency F1 - 200 KHz F2 - off HdB - 57.0 VdB - 69.0 Rot - 56° Probe drive - mid LPF - 100 HPF - 0 H Pos - 80% V Pos -20% b. Refer to Eddy Current Method, paragraph 1.4.11.  Set up on test block as follows: (1) Null probe on test block. (2) Adjust phase as required to obtain horizontal lift-off. (3) Move probe over all three notches in test block.  Adjust gain to obtain a three block vertical signal when probe is passed over 0.040-inch notch in test block.  (See the standard instrument display shown in Figure 1-7.) 2-17