Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2.7.3.2 Preparation of Helicopter
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  2-6.   M ain  Rotor  Hub
Up
TM-1-1520-265-23 H-60 Helicopter Series Manual
Next
Figure  2-7.   Spindle

TM 1-1520-265-23 2-12 Change 3 d. Cable Assembly e. Adapter, probe, 2 MHz f.   Reference Block, three-notched titanium (0.008, 0.020, 0.040 EDM notches) g. Teflon Tape, refer to Table 1-8 h. Aircraft Marking Pencil, refer to Table 1-8 2.7.3.2 Preparation of Helicopter.  The helicopter shall be prepared for safe ground maintenance. A partial inspection for cause (visual indications, sites of mechanical damage, corrosion, etc.) may be performed on all exposed surfaces of the installed part using this procedure. If required, the spindle shall be removed in accordance with the applicable technical manuals listed in Table 1-1. 2.7.3.3 Access. Access to the spindle is from the L/R engine cowl (Figure 1-4, Items 3T-7 and 4T-8). 2.7.3.4 Preparation of Part.  The part shall be thoroughly cleaned. Refer to Preparation of Part or Area for NDI, paragraph 1.4.4. 2.7.3.5 NDI Equipment Settings. a. Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-19eII. Frequency F1 - 1000 KHz F2 - off HdB - 57.0 VdB - 69.0 Rot - 30_ Probe drive - mid LPF - 100 HPF - 0 H Pos - 80% V Pos - 20% b. Refer to Eddy Current Method, paragraph 1.4.11. Set up on test block as follows: (1) .Null probe on test block. (2) .Adjust phase as required to obtain horizontal lift-off. (3) .Move probe over all three notches in test block. Adjust gain to obtain a three block vertical signal when probe is passed over 0.040-inch notch in test block. (See the standard instrument display shown in Figure 1-7.) 2.7.3.6 Inspection Procedure.  Refer to Eddy Current Method, paragraph 1.4.11 and Figure 2--7. a. Place probe on a good area in the inspection location and null. Adjust phase as required to obtain horizontal lift-off. b. Inspect the part. c.  Any signal similar to the notches in the test block are cause for rejection.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing