Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: MAIN ROTOR BLADE TIP CAP FAIRING (ET).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
BIFILAR WEIGHT TAPERED WASHERS (PT)
Up
TM-1-1520-265-23 H-60 Helicopter Series Manual
Next
Backup Method

TM 1-1520-265-23 2.19 MAIN ROTOR BLADE TIP CAP FAIRING (ET). 2.19.1 Description (Figure 2-1.  Index No.19).  The main rotor blade tip cap fairing is located at the tip end of the main rotor blade where it forms the tip end contour of the blade airfoil. 2.19.2 Defects.  This inspection is used to verify crack indications found visually on the main rotor blade tip cap fairing. No cracks are allowed. 2.19.3 Primary Method.  Eddy Current. 2.19.3.1 NDI Equipment and Materials.  (Refer to Appendix B.) a. Eddy Current Inspection Unit b. Probe, straight, shielded surface, 100 KHz-500 KHz c. Probe, right angle, shielded surface, 100 KHz-500 KHz, 900 1/2 inch drop d. Cable Assembly e. Reference Block, three-notched aluminum (0.008, 0.020, 0.040 EDM notches) f. Teflon Tape, refer to Table 1-8 g. Aircraft Marking Pencil, refer to Table 1-8 2.19.3.2 Preparation of Helicopter.  The helicopter shall be prepared for safe ground maintenance.  A partial inspection for cause (visual indications, sites of mechanical damage, corrosion, etc.) may be performed on all exposed surfaces of the installed part using this procedure.  If required, the main rotor blade tip cap fairing shall be removed in accordance with the applicable technical manuals listed in Table 1-1. 2.19.3.3 Access.  Not applicable. 2.19.3.4  Preparation  of  Part.    The  part  shall  be  thoroughly  cleaned.    Refer  to  Preparation  of  Part  or  Area  for  NDI, paragraph 1.4.4. 2.19.3.5 NDI Equipment Settings. a. Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-1 9e1. Frequency F1 - 200 KHz F2 - off HdB - 57.0 VdB - 69.0 Rot - 56" Probe drive   - mid LPF - 100 HPF - 0 H Pos - 80% V Pos - 20% 2-43

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing