Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: BIFILAR WEIGHT TAPERED WASHERS (PT)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Bifilar Weight Bushings (PT)
Up
TM-1-1520-265-23 H-60 Helicopter Series Manual
Next
MAIN ROTOR BLADE TIP CAP FAIRING (ET).

TM 1-1520-265-23 2--42.2 Change 2 2.18B   BIFILAR WEIGHT TAPERED WASHERS (PT). 2.18B.1    Description (Figure 2-1, Index No. 18B). The bifilar weight washers are installed within the body of the bifilar weight. 2.18B.2    DefectsInspect the washers for stress cracks. No cracks are allowed. 2.18B.3    Primary Method. Fluorescent Penetrant. 2.18B.3.1 NDI Equipment and Materials. (Refer to Appendix B.) Inspection Equipment is listed in Table 1-7. AMS 2644 level 3 penetrant materials shall be selected from the approved list in Table 1-8. Parts requiring flourescent penetrant inspection shall be cleaned prior to inspection with n--Pro- pyl Bromide (vapor degreasing only)(Table 1--8), DS--108 (Table 1--8), Electron (Table 1--8), Posi- tron (Table 1--8). DS--108, Electron, Positron must be followed by an acetone (Table 1--8) rinse or wipe: or drying until there is no visible solvent residue left on parts. 2.18B.3.2 Preparation of Helicopter. The helicopter shall be prepared for safe ground mainte- nance. A partial inspection for cause (visual indications, sites of mechanical damage, corrosion, etc.) may be performed on all exposed surfaces of the installed part using this procedure. The wash- ers shall be removed from the bifilar weight in accordance with the applicable technical manuals listed in Table 1-1. 2.18B.3.3 Preparation of Part. Refer to Preparation of Part or Area for NDI, paragraph 1.4.4. 2.18B.3.4 Inspection Procedure. Perform fluorescent penetrant inspection. Refer to Fluores- cent Penetrant Method, paragraph 1.4.7 and Table 1-5. Inspect area of concern. 2.18B.3.5 Marking and Recording of Inspection Results. Mark and record inspection results as required by paragraph 1.3. 2.18B.3.6 Backup Method. None required. 2.18B.3.7 System Securing. Clean the washers to remove inspection media. Refer to Post Cleaning and Restoration of Part or Area After NDI, paragraph 1.4.16. The washers require installa- tion in accordance with the applicable technical manuals listed in Table 1-1. Figure  2-18.  Bifilar  Weight  (Sheet  3  of  3)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing