Click here to make tpub.com your Home Page

Page Title: Section II FUEL CONTROL - PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALL FUEL CONTROL (Continued)
Up
TM-55-2840-254-23-4 Engine Gas Turbine Model T55-L-712 Manual
Next
PRESERVE FUEL CONTROL (Continued)

TM 55-2840-254-23
Section II FUEL CONTROL - PREPARATION FOR STORAGE OR SHIPMENT
6-7
6-7 PRESERVE FUEL CONTROL
General Safety Instructions:
All
Lubricating oil (E31) can cause paralysis
Tools:
Powerplant Mechanic's Tool Kit,
if swallowed. Prolonged contact with it
NSN 5180-00-323-4944
may irritate the skin. Handle only in
Hose Assembly (Appendix E) (2)
well-ventilated areas away from heat and
Socket Wrench Handle
flame. Drain and store in approved metal
Container, 2 Gallon (2)
safety containers. Avoid prolonged or
repeated contact with skin and do not
take internally. Wash contacted areas of
Materials:
High Pressure Caps
skin thoroughly after handling. If irrita-
Lubricating Oil (E31)
tion of skin results, get medical attention.
Get medical attention for eyes.
Personal Required:
681310 Aircraft Powerplant Repairer (2)
Equipment Condition:
Off Engine Task
Fuel Control Removal (Task 6-1)
NOTE
If fuel control is removed from engine
and is not to be reinstalled for a period
longer than 46 hours, it must be pre-
Served.
1. Place fuel control (1) in horizontal position.
2. Install three high pressure caps (2) on three
fittings (3).
GO TO NEXT PAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us