Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALL APU IN SHIPPING CONTAINER
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INSTALLATION
Up
TM-55-2835-209-23 Gas Turbine Engine (Auxiliary Power Unit APU) Model T 62T 40 I Part Numbers 116305-100 and 116305-200 Manual
Next
INSTALL APU IN SHIPPING CONTAINER (cont)

TM  55-2835-209-23 Section II INSTALL APU IN SHIPPING CONTAINER 2-2 INSTALL APU IN SHIPPING CONTAINER INITIAL  SETUP Tools: Aircraft Inspection Tool Kit (T49) Engine Repairman’s Tool Kit (T47) Lifting Sling (T63) Nitrogen  Pressurizing  System Shipping   Container Personnel  Required: 68B  Aircraft  Powerplant  Inspector 68B  Aircraft  Powerplant  Repairer Assistant Materials/Parts: Desiccant  (D11) Humidity  Indicator  (D14) Nitrogen  (D22) Soap (D34) General  Safety  Instructions: Do not stand under engine while it is being moved on a hoist. To prevent injury to personnel and damage to equip- ment during handling of APU, periodically check lifting sling. If there are any signs of  abuse  or  excessive  wear, notify local safety represen- tatives. References: TB   55-8100-200-24 2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing