Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 3-2. Lubrication Order (Sheet 2 of 2)
Up
TM-5-6115-612-12 Generator Set Diesel Engine Driven Tactical Skid Mtd. 600 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Table 3-2. Preventive Maintenance Checks and Services (PMCS) - Continued

ARMY TM  5-6115-612-12 MARINE  CORPS  TM  6115-12/7 AIR  FORCE TO 35C2-3-471-1 NAVY AG-320B0-0MM-000 Section III. PREVENTIVE  MAINTENANCE  CHECKS  AND  SERVICES  (PMCS) 3-3.  GENERAL.  TO ensure that the generator set is ready for operation at all times, it must be inspected system- atically so that defects may be dis- covered  and  corrected  before  they  re- sult in serious damage or failure. The necessary preventive maintenance checks and  services  (PMCS)  that  are  to  be performed by Operator/Crew personnel are listed and described in table 3-2. Defects discovered during operation shall be noted for future correction. Stop operation immediately  if  a  de- ficiency is noted that could damage the equipment. All deficiencies and shortcomings  shall  be  recorded  on  the applicable form together with the cor- rective  actions  taken.    Air Force users shall refer   to   the   applicable   in- spection manuals and work card sets in the TO 35C2-3 series for periodic re- quirements, and table 3-2 for detailed procedures. Marine Corps users shall refer to current issue of TM 11275-15-1. 3-4.  (A,  N, MC) PREVENTIVE  MAIN- TENANCE  CHECKS  AND  SERVICES. Table 3-2  provides  a  listing  of  PMCS  that shall be performed by the Operator/Crew personnel. The item numbers are listed consecutively and indicate the sequence of performance. Table 3-2. Preventive  Maintenance  Checks  and  Services  (PMCS) B   -  Before  operation 0.5 D   -  During  operation 0.2 A   - After operation 0.1 Total M/H: 0.8 Interval Operator Work Daily Items to be inspected Time B D A Inspection     procedures     ___ M/H 1 GENERATOR  SET 0.1 Set handbrake. Visually  inspect  unit  for physical  damage. Check ground cable and ensure  that  generator  set  is  properly grounded. Ensure that set is free of tools and rags and that there is no spilled fuel or lubricating oil. 2 CONTROL  PANEL Ensure MASTER SWITCH is in OFF position. Ensure that panel lights and press- to-test  indicators  operate  properly. Inspect  meters  and  indicators  for  broken glass  and  missing  indicator  lamps. 0.1 3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing