Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-16(3). Operation to Deliver Heated Air (Sheet 3 of 3). (TS 6115-590-12/2-163)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-16(2).  Operation to Deliver Heated Air (Sheet 2 of 3).  (TS 6115-590-12/2-162)
Up
TM-5-6115-590-12 Generator Set Engine Driven Tactical Skid Mtd 10 Kw 1 Phase - 2 Wire 1 Phase - 3 Wire 3 Phase - 4 Wire Manual
Next
Operation In Dusty or Sandy Areas

TM 5-6115-590-12 Figure 2-16(3).  Operation to Deliver Heated Air (Sheet 3 of 3).  (TS 6115-590-12/2-163) (2)  Insure that the nickel-cadmium batteries are fully charged. WARNING Battery electrolyte is very corrosive (Potassium Hydroxide).      Wear   rubber   gloves,   apron   and face shield when handling leaking batteries.  If battery   electrolyte   (Potassium   Hydroxide)   is spilled   on   clothing,   or   other   material,   wash immediately   with   clean   water.      If   spilled   on personnel,    start    flushing    the    affected    area immediately with large amounts of clean water. Continue    flushing    until    medical    assistance arrives. CAUTION When   servicing   or   adding   water   to   nickel- cadmium batteries, do not use a hydrometer or syringe that has been used to service lead-acid batteries.          Residue     acid     induced     in     the electrolyte will destroy the batteries. (3)      Check   that   the   master   switch   on   the instrument  panel  is  in  the  STOP  position,  and  the fuel heater switch is in the OFF position (4)    Press  in  the  turbine  and  heater  battery activation  circuit  breakers  on  the  receptacle  panel and  wait  until  the  breakers  snap  out  to  the  OPEN position, repeat the procedure. (5)    Press  the  fuel  heater  circuit  breaker  on the  receptacle  panel  to  the  IN  position.    Place  the fuel    heater    switch    on    the    instrument    panel    in HEATER  position.    Leave  switch  on  until  the  fuel warm   light   on   the   instrument   panel   Illuminates. When fuel is warmed, place the fuel heater switch in the No.  2 battery position. (6)    Refer  to  paragraph  2-10  and  start  the power plant. 2-16.  Operation in Extreme Heat a.    The  power  plant  will  operate  satisfactorily  at ambient temperature, up to 125°F.  (52°C) b.    The  operation  of  the  power  plant  in  extreme heat  increases  the  evaporation  rate  of  water  from battery electrolyte.  Check battery electrolyte level. Change 1 2-24

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing