Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-16(2). Operation to Deliver Heated Air (Sheet 2 of 3). (TS 6115-590-12/2-162)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Section II.  Operation of Auxiliary Equipment
Up
TM-5-6115-590-12 Generator Set Engine Driven Tactical Skid Mtd 10 Kw 1 Phase - 2 Wire 1 Phase - 3 Wire 3 Phase - 4 Wire Manual
Next
Figure 2-16(3).  Operation to Deliver Heated Air (Sheet 3 of 3).  (TS 6115-590-12/2-163)

TM 5-6115-590-12 Figure 2-16(2).  Operation to Deliver Heated Air (Sheet 2 of 3).  (TS 6115-590-12/2-162) b.  When operating in temperatures below freezing, connect  electrical  connectors  on  supply  and  drain water     hose     assembly     and     dual     water     hose assembly to water line heater connectors on power plant receptacle panel. Connect water recirculating hose    assembly    to    connectors    on    shelter.        If operation  of  the  power  plant  is  to  be  discontinued for   more   than   15   minutes   during   extreme   cold conditions,   drain   and   dry   the   water   system   as described in paragraph 4-4a (3). c.  Keep batteries fully charged at all times. CAUTION Operate  the  power  plant  for  at  least  1  hour  after adding water to batteries.  Water added to batteries may  freeze  unless.    It  is  immediately  mixed  with electrolyte.      Remove   frozen   batteries   from   the power  plant  immediately  upon  discovery  to  avoid damage   caused   by   leaking   from   cracked   cases when the battery thaws. d.    For  efficient  starting  and  operation  in  ambient temperature  below  -25°F,  a  winterization  kit  must be installed that contains nickel-cadmium batteries and the following procedures must be observed. NOTE For Operation Below -25 F Ambient use Lubricating Oil Per MIL-L-7808. Flush System when Winterization Kit is Installed or Removed. (1)  Check that the turbine and heater battery activation circuit breakers, located on the receptacle panel, are pulled out prior to connecting the batteries. Change 5 2-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing