Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-15(3). Operation to Deliver Cooled Air (Sheet 3 of 3). (TS 6115-590-12/2-153)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-15(2).  Operation to Deliver Cooled Air (Sheet 2 of 3).  (TS 6115-590-12/2-152)
Up
TM-5-6115-590-12 Generator Set Engine Driven Tactical Skid Mtd 10 Kw 1 Phase - 2 Wire 1 Phase - 3 Wire 3 Phase - 4 Wire Manual
Next
Section II.  Operation of Auxiliary Equipment

TM 5-6115-590-12 Figure 2-15(3).  Operation to Deliver Cooled Air (Sheet 3 of 3).  (TS 6115-590-12/2-153) (4)  Place remote operation switch (fig.  2-1) on   operating   power   plant   in   OPERATE   RESET position then release switch. Place remote operation switch (fig.  2-12) on nonoperating power plant  in  OPERATE  RESET  position  then  release switch. (5) When ventilating air from the nonoperating   power   plant   is   no   longer   required, place  remote  operation  switch  (fig.    2-1)  on  both power  plants  in  the  OFF  position  and  disconnect the power cables. k.  Operation to Deliver Auxiliary 400 Hz Power.  If additional 400 Hz electrical power is required from the   power   plant   connect   and   operate   the   power plant as follows: NOTE If  No.    1  auxiliary  power  output  is  operated,  only No.    2  auxiliary  conditioned  air  or  heating  system will  operate.    If  No.    2  auxiliary  power  output  is operated,  only  No.    1  auxiliary  conditioned  air  or heating system will operate.  If both auxiliary power outputs  are  used,  neither  conditioned  air  system will operate. (1)    Connect  400  Hz  electrical  power  output cable assembly (fig.  1-15), sheet 2 of 7) to 400 Hz auxiliary power receptacles (fig. 2-9) and to point of use. (2)  Operate power unit for delivery of 400 Hz power as described in paragraph 2-11b. (3)        Place    auxiliary    power    switches    for desired   outputs   (output   1,   output   2,   or   both)   in RESET OPERATE position (fig.  2-3).  Power plant will deliver 400 Hz from the 400 Hz auxiliary power switches. (4)      When   400   Hz   auxiliary   power   is   no longer required, place auxiliary power switches (fig. 2-3)    in    OFF    position    and    disconnect    400    Hz electrical power output cable assembly. 2-21

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing