Click here to make tpub.com your Home Page

Page Title: WHEEL AND TIRE - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
WHEEL AND TIRE - CONTINUED
Up
TM-9-2330-328-14-P Chassis Containerized Kitchen Trailer: 7 1/2-Ton 4 Wheel XCK2000 Trailer: 7 1/2-Ton 4-Wheel XCK2000E1 Manual
Next
Chapter 6. ORGANIZATIONAL MAINTENANCE

TM 9-2330-328-14&P
OPERATOR MAINTENANCE PROCEDURES - Continued
0012 00
WHEEL AND TIRE - Continued
LOCATION
ITEM
ACTION
7. Hub (1)
Outer wheel (2)
Place in position.
Position inner and outer valve stems 180
degrees apart (7).
8. Hub studs
Eight capnuts (3)
Using wheel socket, install.
Tighten using illustrated tightening sequence.
9. Axle (4)
Wheels and tires
Using hydraulic jack (6), lower.
(2 and 5)
Remove jack.
10. Outer wheel (2)
Eight capnuts (3)
Using wheel socket and illustrated tightening sequence,
retighten.
NOTE
Have Organizational Maintenance torque capnuts using torque wrench to 190 to 210 ft. lb (258 to 285 N·m).
7
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us