Click here to make tpub.com your Home Page

Page Title: Replace
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
OPENER, CAN, MOUNTED.
Up
TM-10-7360-209-13-P Kitchen Company Level Field Feeding (KCLFF) and Kitchen Company Level Field Feeding-Enhanced (KCLFF-E) Manual
Next
Ice Chest Lid.

TM 10-7360-209-13&P
b.
Replace
1.  Measure, cut and miter to size gasket bulk material
2.  Drill screw holes in gasket (Figure G-l, appendix G).
3.  Apply vinyl cement (Item 5, Appendix F) to gaskets (3) and (7) miter joints and between gaskets (3) and
(7) and lid bottom making certain that the complete width of flange is covered with cement.
4.  Install gaskets (3) and (7) on lid bottom Ensure vinyl cement is thoroughly dry before installing retainers
5.  Install two long gasket retainers (6) and secure 22 slotted screws (5).
6.  Install two short gasket retainers (2) and secure with 22 slotted screws (1).
Drain
a.
Remove.
1.
Remove drain hose (1).
2.
Unscrew plastic elbow (2) and washer (3) from bottom of ice chest (4).
b.
Replace.
1.
Assure that the dram hose (1) and plastic elbow are clear of obstructions.
2.
Install plastic elbow (2) in bottom of ice chest (3). Hand tighten.
3.
Replace hose (1) on elbow (2).
Change 3 4-13

Privacy Statement - Press Release - Copyright Information. - Contact Us