Click here to make tpub.com your Home Page

Page Title: OPERATING PROCEDURES. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
OPERATING PROCEDURES. (cont)
Up
TM-10-7360-209-13-P Kitchen Company Level Field Feeding (KCLFF) and Kitchen Company Level Field Feeding-Enhanced (KCLFF-E) Manual
Next
OPERATING PROCEDURES. (cont)

TM 10-7360-209-13&P
2-6. OPERATING PROCEDURE (Continued)
j .  When the water in the Heater Tank Assembly has begun to boil, a maximum
of 20 tray packs may be loaded into the tank in the following manner.
(1) The trays are to be arranged on edge in two rows of ten.
( 2 ) The first tray should be located in the tank with the bottom
of the tray against the side of the tank and the short side down.
(3) Close covers on tank.  It is not necessary to secure covers with
the catches.  The catches are intended for use during transport.
k. Closely monitor the pressure gage on the M2 burner unit while the
trays are being heated.
l .  After 45 minutes in the boiling water, the trays will have reached
the serving temperature of 165°F (74°C).
2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us