Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SAFETY VALVE DEVICE KIT INSTALLATION -cont
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
SAFETY VALVE DEVICE KIT INSTALLATION
Up
TM-10-7360-204-13P Range Outfit Field Gasoline Model M59 Manual
Next
FIGURE 4-3 SAFETY DEVICE ASSEMBLY

TM 10-7360-204-13&P Change 11         4-18.1 (4) Cut out attached template figure 4-4 (or template furnished with safety system kit) and bend tabs as shown. (5) Place template over top of mixing chamber and secure with tape. Using tap, punch mark to location of the hole to be drilled in the side of the mixing chamber. Drill a 3/16” diameter hole at the marked location to be used as a pilot hole: then with a 1/2” diameter drill, complete drilling the hole. (Remove burrs with a file.) (6) Remove pressure gage and 1/8” street elbow. (para. 4-9.5) (7) Dissasemble tubing from safety system assembly. (8) Assemble safety valve into branch tee into adapter where street elbow was removed. Add nipple and 45o elbow into open end of the branch tee fitting (see Figure 4-3). Addpermatex to air pressure gage threads. (9) Reassemble gage into 45o elbow fitting. (10) Reinstall mixing chamber. (para. 4-9.3). (11) Reattach tubing to safety valve and, using bulkhead nuts, secure the tubing into the drilled hole in the mixing chamber. (12)    Reattach the generator. (para 4-9.2). Use extreme care when utilizing the air compressor to pressurize the fuel tank. (13) Test safety system for proper functioning by pressurizing the tank, using air compressor. to approximately 60 ± 5 psig where safety valve should operate.After safety valve opens. pressure should drop rapidly to approximately 35 ± 10 psig at which point safety valve should close. Using soapy solution.check for leaks. (14) Set burner unit on end and release air pressure. ( para. 4-9.8). (15) Remove the generator. (para. 4-9.2) (16) Reinstall bottom shield, burner generator, and top shield .p (  aras. 4-9.3, 4-9.2, and 4-9.1) WARNING

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing