Click here to make tpub.com your Home Page

Page Title: PMCS TABLE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
PMCS PROCEDURES
Up
TM-10-7360-201-10 Bakery Plant Trailer Mounted Field Models M-1945 M-1945-50 M-1945-53 and M-534-68 Manual
Next
MIXING AND MAKEUP OUTFIT TRAILER (FRONT)

TM 10-7360-201-10
2-6. PMCS PROCEDURES-- Continued
i.
Remove covers and open or remove access doors/panels only as required to visually inspect. If additional
disassembly and reassembly beyond steps normally done in setting up and operational procedures are required to
determine or repair actual defect, contact organizational maintenance or consult TM 10-7360-201-20.
2-7. PMCSTABLE
MIXING AND MAKEUP OUTFIT TRAILER (FRONT)
B - Before Operation
D - During Operation
A - After Operation
ITEM
INTERVAL
ITEM TO BE INSPECTED
Equipment Is Not
NO.
B
D
A
PROCEDURE
Ready/Available If:
Inoperative
1
POWER PANEL CIRCUIT BREAKERS,'PLUGS,
CONNECTORS, AND RECEPTACLES. Check for
loose mounting and connections.
2
WATER TEMPERING TANK. Clean tank. Check
Unsanitary
for leaks.
3
VALVE, (CONTROL). Check for leaks.
4
WATER TRANSFER PUMP AND PIPING. Check
Inoperative
for leaks.
5
VALVES, (CHECK). Check for leaks.
6
Unsanitary
DOUGH TROUGH. Clean dough trough
2-21

Privacy Statement - Press Release - Copyright Information. - Contact Us