| ||||||||||
|
|
![]() ![]() LO10-7360-201-20-6
LUBRICATION ORDER
30 AUGUST 1990
(Supersedes LO 10-7360-201-20-6, 4 Feb. 66)
BAKERY PLANT, TRAILER-MOUNTED, M-1945: (CHASSIS, TRAILER:
2 1/2-TON, 2-WHEEL, M537 USED WITH
BAKERY OVEN, M533)
REFERENCE: L010-7360-201-20-1,-2.-3.-4,-5. C9100-IL
Approved for public release; distribution is unlimited.
Intervals are based on normal operation. Reduce to com
Clean fittings before lubricating.
pensate for abnormal operation and severe conditions.
Clean parts with SD (Solvent, drycleaning).
During inactive periods, sufficient lubrication must be
Dry before lubricating.
performed for adequate preservation.
Broken arrow shafts indicate lubrication points on both
Relubricate after washing or fording..
sides of the equipment
LUBRICANT · INTERVAL
INTERVAL · LUBRICANT
Retractable Support GAA
GAA Retractable Support
Bracket and Spindle
Gear and Bearing
Assembly (See Note 1)
(See Note 1)
GAA Retractable Support
Handbrake Flexible GAA
Shaft Screw
Control Link Cable
(See Note 1)
(See Note 9)
HBA
Master Cylinder
(Fill to 1/2 Inch
Wheel Bearings GAA
From Top)
(Remove, Clean and
(Capacity: 1 pint)
Pack) (See Note 7)
(See Note 8)
Leveling Jack Swivel
OE
OE
Leveling Jack Inner
Lock Pin (See Note 3)
Tube (See Note 2)
Leveling Jack Swivel
OE
GAA Leveling Jack
(See Note 4)
Gear and Bearing
(See Note 5)
Leveling Jack Screw GAA
(See Note 5)
CARD 1 of 2
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |