Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: QA FORM 3, MATERIAL REJECT TAG
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
Major Departures from Specifications
Up
Electronics Technician Supervisor (ETC)
Next
REFERENCES

immediately start the parer work? No! The originator must ensure that the departure is identified during fabrication,  testing,  or  inspection  of  the  completed work. He or she must make every effort to correct each deficiency before initiating the departure request. Work must not continue until the deficiency is corrected or the departure  request  is  approved. Now  that  we  have  identified  a  departure,  what  do we do with it? We go back to the originator. He or she must ensure that QA Form 12 is properly filled out and forwarded via the chain of command to the QAO. The  originator  must  also  retain  a  copy  of  the prepared departure request until he or she receives the returned copy from the QAO indicating that all actions concerning   the   departure   have   been   completed (approved  or  disapproved). Make sure that the originator has an approved copy of  the  departure  request  accompanying  the  completed work and that the original copy is retained in the CWP. QA FORMS AND RECORDS The following are the titles and descriptions of the forms  and  records  you  will  use  the  most.  A  rule  to remember when using these forms is that all QA forms must be completed and signed in the proper sequence. QA FORM 1, THE MATERIAL RECEIPT CONTROL RECORD This record is used by the CMPO to document the proper receipt and inspection of items that have been designated  as  controlled  materials. QA FORM 2, MATERIAL IN-PROCESS CONTROL  TAG This  tag  is  attached  by  supply,  QA,  or  shop personnel  to  provide  traceability  of  accepted  controlled material   from   receipt   inspection   through   final acceptance. QA FORM 3, MATERIAL REJECT TAG Shop  personnel,  supply,  or  QA  personnel  will  attach this tag to rejected items. The individuals finding or causing  the  unacceptable  condition  attaches  the  tag  to the rejected item. The tag indicates that the material is unacceptable for production work and must be replaced or  reinspected  before  use. QA FORM 4, SHIP-TO-SHOP TAG This tag is used to identify and control material to be repaired. You attach the tag to the item to be repaired It is a good idea to stamp the three sections of the tag with a control number and log it in your shop log. QA FORM 7, CONTROLLED MATERIAL INVENTORY/RECORD This  form  is  used  by  your  CMPO  to  provide  a standard   inventory   record   of   controlled   material received and issued. QA FORM 9, RE-ENTRY CONTROL FORM This  form  is  used  to  document  re-entry  into  a SUBSAFE boundary and is used in a controlled work procedure. QA FORM 17, TEST AND INSPECTION FORM-OTHER  THAN  NDT QA Form 17 lists all the tests and inspections that must be performed at each step. A QA Form 17 must be completed and signed off before any step can be signed off on the QA Form 10. QA FORM 34, TORQUE/CONTROLLED ASSEMBLY  REPORT This form consists of two enclosures: the torque sequence sketch and a QA Form 17 listing all of the required  torque  readings. SUMMARY The QA concept involves preventing the occurrence of defects. Quality assurance covers all events from the start of a maintenance action to its completion and is the responsibility  of  all  maintenance  personnel.  In  addition, organization  of  your  workspaces,  your  ways  of  storing parts, and your relationships with the SKs all affect the quality of your product. By carefully following the methods and procedures outlined in your QA program manuals and by paying careful attention to the quality of work in your area, you will  contribute  greatly  to  the  operational  effectiveness of both your ship and tended units. 6-13

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing