Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: QUESTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
Figure   2-22.—Types  of  manholes
Up
Engineering Aid 2 - Intermediate Structural engineering guide book
Next
CHAPTER 3 HORIZONTAL CONSTRUCTION

Typical peak flow factors range from 4 to 6 for small areas down to 1.5 to 2.5 for larger areas. An allowance for  unavoidable  infiltration  of  surface  and  subsurface water into the lines is sometimes added to the peak flow to obtain the design flow. A typical infiltration allowance is 500 gallons per inch of pipe diameter per mile of sewer  per  day.  From  the  types  of  sewage  and  the estimated design flow, the engineer can then tentative] y select the types, sizes, slopes, and distances below grade of the piping to be used for the system. Then  preliminary  drawings  of  the  system  are prepared. The preliminary drawings should include both plans  and  profiles  of  the  proposed  wastewater  system and  all  buildings,  roads,  waterways,  utilities,  geology, and so forth, that may affect the design. As an EA, you may be called upon to assist in the preparation of the preliminary  plans.  When  existing  topographic  maps  of sufficient detail are available, they may be used in selecting the routing of the proposed system. However, when  existing  maps  are  not  available  or  to  ensure sufficient  detail,  you  may  be  required  to  conduct topographic  and  preliminary  route  surveying  upon which the routing will be based. The procedures for these surveys are explained in chapters 8 through 10 of this manual. Upon  acceptance  of  the  preliminary  designs,  final design may begin. During this phase, adjustments to the preliminary  design  should  be  made  as  necessary,  based upon  additional  surveys,  soil  analysis,  or  other  design factors. The final designs should include a general map of the area that shows the locations of all sewer lines and structures.  They  also  should  include  detailed  plans  and profiles  of  the  sewers  showing  ground  elevations,  pipe sizes and slopes, and the locations of any appurtenances and structures, such as manholes and lift stations. Construction plans and details are also included for those  appurtenances  and  structures. Q1. Q2. Q3. Q4. Q5. Q6. Q7. Q8. Q9. Q1O. QUESTIONS Name the two systems that comprise an overall power  system. What system of arranging primary feeders is the least  reliable  but  the  most  commonly  used? What  is  the  purpose  of  a  distribution  trans- former? In relation to the primary mains, where on a power distribution pole should the secondaris be  located? Under what circumstances are concrete power distribution  poles  authorized  for  use  on  a  Navy installation? On  a  drawing  of  an  overhead  electrical  dis- tribution system what information should you show for the overhead conductors? Define  water  table. What three primary factors must an engineer consider when selecting a water source? When, if ever, is it permissible to install a water line and a sanitary sewer line in the same trench? In a waste water system, what is the purpose of a lift  station? 2-22