Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

 

Click here to make tpub.com your Home Page

Page Title: QUESTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books

   
Back
LAND SURVEY PRECISION
Up
Engineering Aid 2 - Intermediate Structural engineering guide book
Next
CHAPTER 11 HORIZONTAL AND VERTICAL CURVES

Q1. Q2. Q3. Q4. Q5. Q6. Q7. Figure 10-36.—Profile and cross-section levels. QUESTIONS Into what three phases are route surveys usually broken? For  what  reasons  should  overhead  electrical pole lines be located on the side of a street that is most free from other lines and trees? As it relates to the surface drainage of water, what does the term “runoff” mean? Refer to figure 10-3. What is the invert of the pipe at station 1 + 50? Refer to the field notes shown in figure 10-36. Assuming the road is 30 feet wide, what is the (a) area of the cross section at station 6 +00 and (b) volume between stations 6 + 00 and 6 + 50? As related to muss diagrams, what is the limit of economic haul? In which of the following ways does an as-built survey performed for the purpose of verifying the location of points as they are constructed in the field differ from an as-built survey that is per- formed for the purpose of monitoring construc- tion progress? a. The amount of time allowed to perform the survey b. The equipment used to perform the survey c. The degree of accuracy required Q8. When staking out a sewer line, at what interval of distance should you usually set the center-line stakes or the offset hubs? Q9.  Refer  to  figure  10-29.  What  is  the  sine  of  the anglee that you should turn from station 10 + 38.83 to locate pile No. 8? Q10.  In  land  surveying,  when  a  metes-and-bounds description  is  being  prepared,  what  may  be added to the bearings of the boundary lines to help in retracing the lines? 10-37

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing