Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

     

Click here to make tpub.com your Home Page

EOCC Verification Checks
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Spill drill for freon
Up
Gas Turbine Systems Supervisor - Supervisor manual for Gas Turbine Engines
Next
Using the Feedback System

Figure  1-5.—Spill  drill  for  freon—Continued. Recognition  of  the  symptoms Probable   causes Probable   effects Preventive   actions   that   may   be   taken   to   reduce, elimimte,   or   control   casualties An   EOSS   package   is   not   intended   to   be   forgotten once   it   is   developed   and   installed.   It   offers   many advantages   to   the   ship’s   operational   readiness capabilities   and   provides   detailed,   step-by-step sequencing   of   events   for   all   phases   of   the   engineering plant   operation. Because   it   is   work-studied   and system-oriented,   the   EOSS   provides   the   basic information  for  the  optimum  use  of  equipment  and systems.  It  does  this  by  specifying  correct  procedures tailored   for   a   specific   plant   configuration. The  EOSS  is  not  intended  to  eliminate  the  need  for skilled   plant   operators. No   program   or   system   can achieve  such  a  goal.  The  EOSS  is  a  tool  for  better  use of   manpower   and   available   skills.   Although   the   EOSS is  an  excellent  tool  for  shipboard  training  of  personnel, it   is   primarily   a   working   system   for   scheduling, controlling,   and   directing   plant   operations   and   casualty control  procedures. EOCC   VERIFICATION   CHECKS Since  EOCC  procedures  are  a  part  of  the  EOSS, EOCC   verification   checks   should   be   performed whenever   the   EOSS   is   verified.   The   purpose   of verification   checks   is   to   validate   required   changes   to EOCC   procedures   due   to   authorized   SHIPALTs, changes   in   operating   philosophy,   or   changes   in parameters. 1-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing