Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

     

Click here to make tpub.com your Home Page

Assignment 1, Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Assignment 1, Continued
Up
Equipment Operator Advanced - Advanced construction equipmet operators manual
Next
Assignment 1, Continued

1-53. COMSECOND/ COMTHIRDNCB Equipo has established what standard PM-to interim  repair  ratio? 1. One scheduled PM inspection to each interim repair 2. Two scheduled PM inspections to each interim repair 3. Three scheduled PM inspections to each interim repair 4. Four scheduled PM inspections to each interim repair 1-54. The first step to take to achieve the PM-to-interim repair ratio is enforcement of what type of maintenance? 1. Operator maintenance 2. Mechanic maintenance 3. Camp maintenance 4. Yard maintenance 1-55. At what time(s) should the trans- portation supervisor always be sure to tour the equipment yard? 1. First thing in the morning 2. Last thing at night 3. During pre and post operations 4. During the lax period of the day and last thing at night 1-56. What person is responsible for changing  a  burned  out  taillight? 1. The mechanic at the quick-fix shop 2. The yard boss 3. The collateral equipage custodian 4. The operator of the equipment 1-57. Equipment availability is the percentage of time the equipment is  available  in  the  mechanic  shop compared  to  deadline. 1-58. Which of the following is NOT a result of poor equipment availability? 1. Overworked or abused equipment 2. Inadequate parts support 3. Shortage of mechanic 4. A strong yard boss program Learning  Objective:  Identify the responsibilities required to  supervise  collateral  equipage operations. 1-59. What person approves the ordering of  collateral  equipage? 1. The maintenance supervisor 2. The transportation supervisor 3. The cost control clerk 4. The collateral equipage custodian 1-60. What are the two basic types of  collateral  equipment? 1. Component  and  automotive 2. Construction  and  automotive 3. Component and tactical 4. Construction and tactical 1-61. Which of the following is/are NOT a  piece  of  tactical  collateral equipage? 1. Bits for the earth auger 2. Side racks 3. Lug wrench 4. Chains  with  hooks 1-62. Outstanding   requisitions,   receipts, issues,  locations,  and  annotations of  allowance  of  a  particular  line item of equipage for each CESE is documented on which of the following  forms? 1. True 2. False 1. CB 40 2. CB 50 3. CB 60 4. CB 70 6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing