Click Here to
Order this information in Print

Click Here to
Order this information on CD-ROM

Click Here to
Download this information in PDF Format

     

Click here to make tpub.com your Home Page

Material Inspection
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Battle Problems, Continued
Up
Engineman 1 & C - Advanced engine mechanics training manual
Next
Preparation for the Material Inspection

Chapter  2—ADMINISTRATION,  SUPERVISION,  AND  TRAINING not have been brought out during the critique. The inspected ship receives a copy of all observers’ reports; in this way, each department is given the opportunity to review the comments and set up a training schedule to cover the weak points. Following  is  a  example  of  an  engineering observer’s report. Engineering observer. . . . . . . . . . . . . Location. . . . . . . . . . . . . . . . . . . . . . . 1.  The  engineering  department’s  evaluation  is based on: (a) extent of the department’s prepara- tion  and  fulfillment  of  the  ordered  conditions  of readiness  as  appropriate  to  the  problem,  (b) extent of correct utilization of the engineering damage control features built into the ship, (c) extent to which proper engineering casualty con- trol  is  accomplished,  (d)  extent  to  which  on  sta- tion  personnel  take  corrective  action  for  control of damage, (e) adequacy of reports and dissemina- tion  of  information,  and  (f)  the  general  handling of the plant in accordance with good engineering practice, and the ability of the department to en- sure  maximum  mobility  and  maneuverability  of the ship and to supply all necessary services to other departments in fighting the ship. 2. Hit . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exercise. . . . . . . . . . . . . . . . . . . . . . . . a. b. c. d. e. f. g. h. Preparation  and  status  of  the  plant. Fulfillment  of  proper  conditions  of readiness. c.   Assurance. d.   Speed. 5. Recommendations Fire and missile hazards. Condition of firefighting and damage control gear. Condition  of  personnel  clothing  and protection. Stationing  and  readiness  of  personnel. The blank parts of the observers’ report forms are  filled  in  as  applicable  to  the  individual observer’s  station.  Items  that  were  not  observed are either left blank or crossed out. Additional information, if required for a certain exercise or condition, may be written on the reverse side of the form. A separate form or sheet is used for each exercise or drill. Remarks or statements made by the observer should be clear and legible. Investigation  and  interpretation  of casualty. MATERIAL  INSPECTION Promptness and effectiveness in taking The purpose of material inspection is to deter- care of casualty. mine the actual material condition of the ship. On i. j. k. 1. Were proper doctrine and procedures used? Were  prompting  and  additional  infor- mation  given  by  observer? Were proper reports made? Readiness of standby units. m. Readiness of alternate and emergency n. o. p. q. lighting and power. Were  proper  safety  precautions  ob- served? Material  deficiencies. Coordination of personnel. Coordination of engineering spaces. 3.  Main  engine  control.  Receipt  of  vital interior   communications,   origination   and transmission of required reports to Conn, Damage Control  Central,  and  other  stations. 4. Action taken by main engine control: a. b. Correct action. Sound   judgment   based   on   good practice. 2-45

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing