| |
Chapter 1 Introduction
Chapter 2 Administration, Supervision, and
Training
- Legal Engineering Records
- Figure 2-1.—Engineering Log—All ships.
- Legal Engineering Records, Continued
- Figure 2-2.—Engineer’s Bell Book, NAVSEA
3120/1.
- Operating Records and Reports
- Figure 2-3. Diesel Engine Operating Record-All
ships
- Figure 2-4. Diesel Engine Operating Record -
All ships (Back)
- Figure 2-5.—Fuel and Water Report (Front).
- Figure 2-6.—Fuel and Water Report (Back).
- Figure 2-7.—Monthly Summary of Fuel and
Steaming Hours Report, CINCLANT FLT Report 3100-4.
- Disposal of Engineering Records and Reports
- Trend and Spectrographic Analysis, Continued
- Figure 2-9.—Compression Pressure Graph.
- Figure 2-10.—Crankcase Vacuum Graph.
- Figure 2-12.—Lube Oil Pressure Graph.
- Figure 2-14.—Rack Setting Graph.
- Trend and Spectrographic Analysis, Continued
- Maintenance and Repair Responsibilities
- Identification of Repair Parts and Materials
- Identification of Repair Parts and Materials,
Continued
- Scheduling Work
- Estimating Work
- Training
- Training Responsibilities, Continued
- Training Programs
- Training Programs, Continued
- Figure 2-17.—Navy Standard Damage Control Symbology.
- Figure 2-17.—Navy Standard Damage Control Symbology—Continued.
- Engineering Operational Sequencing System
- Figure 2-18.—Preprinted message format.
- Engineering Operational Sequencing System ,
Continued
- Figure 2-19.—Sample plant procedure Chart.
- Figure 2-20.—Sample Plant Status Diagram.
- Figure 2-21.—Sample preferred alignment
diagrams.
- Figure 2-22.—Sample Training Diagrams.
- Engineering Operational Sequencing System ,
Continued
- Figure 2-23.—Sample Component/System
Alignment Diagram.
- Inspections and Trials
- Inspecting Party
- Administrative Inspection Checkoff Lists,
Continued
- Administrative Inspection Checkoff Lists,
Continued
- Operational Readiness Insepction
- Battle Problems, Continued
- Material Inspection
- Preparation for the Material Inspection
- Conduct of the Inspection
- Board of Inspection and Survey Inspection
- Ship Trials
- Post Repair Trial
- Full Power and Economy Trials, Continued
- Full Power and Economy Trials, Continued
- Full Power and Economy Trials, Continued
Chapter 3 Engine Maintenance
Chapter 4 Reduction Gears and Related Equipment
Chapter 5 Engine Performance and Efficiency
Chapter 6 Refrigeration and Air Conditioning
Chapter 7 Auxiliary Machinery
- Cylinders and Pistons
- Cylinders and Pistons, Continued
- Lubricating and Cooling Systems
- Care and Maintenance of Air System Equipment
- Figure 7-1.—PMS tests and inspections for
compressed air plants
- Auxiliary Boilers
- Figure 7-2.—Troubleshooting guide—auxiliary
boilers
- Initial Treatment
- Table 7-3.—Chemical Weights For Freshly
Filling Some Auxiliary Boilers
- Figure 7-3.—Auxiliary Boiler Chemical
Injection Procedure
- Table 7-4.—Trisodium Phosphate Dosage For
Natural Circulation Auxiliary Boilers (Trisodium Pbosphate, Dodecahydrate, Na3
PO4 12H20)
- Table 7-5.—Disodium Phosphate Dosage For
Natural Circulation Auxiliary Boilers (Disodium Phoshate, Anhydrous Na2HPO4)
- Table 7-6.—Calculated Trisodium Phosphate
Dosages For Some Natural Circulation Auxiliary Boilers (Trisodium Phosphate,
Dodecahydrate Na3Po412H2O)
- Table 7-7.—Calculated Disodium Phosphate
Dosages For Some Natural Circulation Auxiliary Boilers, (Disodium Phosphate
Anhydrous, Na2HPO4)
- Hydraulic Systems
- Electrical Troubles
- Maintenance
- Piping and Fittings
- Figure 7-4.—Servovalve—neutral.
- Figure 7-5.—Servovalve—actuated.
- Distilling Plants
- Causes of Low Plant Output
- First-Effect Tube Nest Vacuum
- Improper Venting of Evaporator Tube Nests
- Air Ejector Operation
- Improper Drainage
- Flash Type Distilling Plants
- Principal Components, Continued
- Principal Components, Continued
- Maintenance of Flash Type Units
- Cleaning Heat Exchangers
- Automatic Pressure Control Devices
- Reducing Valves
- Pneumatic Pressure-Controlled Reducing Valve,
Continued
Chapter 8 Environmental Pollution
Chapter 9 Engineering Casualty Control
Index
Assignment Questions
- Assignment 1
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 1, Continued
- Assignment 2
- Assignment 2, Continued
- Assignment 2, Continued
- Assignment 2, Continued
- Assignment 2, Continued
- Assignment 2, Continued
- Assignment 3
- Assignment 3, Continued
- Assignment 3, Continued
- Assignment 3, Continued
- Assignment 3, Continued
- Assignment 3, Continued
- Assignment 3, Continued
- Assignment 4
- Assignment 4, Continued
- Assignment 4, Continued
- Assignment 4, Continued
- Assignment 4, Continued
- Assignment 4, Continued
- Assignment 4, Continued
- Assignment 5
- Assignment 5, Continued
- Assignment 5, Continued
- Assignment 5, Continued
- Assignment 5, Continued
- Assignment 5, Continued
- Assignment 5, Continued
- Assignment 6
- Assignment 6, Continued
- Assignment 6, Continued
- Assignment 6, Continued
- Assignment 6, Continued
- Assignment 6, Continued
- Assignment 7
- Assignment 7, Continued
- Assignment 7, Continued
- Assignment 7, Continued
- Assignment 7, Continued
- Assignment 7, Continued
- Assignment 8
- Assignment 8, Continued
- Assignment 8, Continued
- Assignment 8, Continued
- Assignment 8, Continued
- Assignment 8, Continued
- Assignment 8, Continued
- Assignment 9
- Assignment 9, Continued
- Assignment 9, Continued
- Assignment 9, Continued
- Assignment 9, Continued
- Assignment 9, Continued
- Assignment 10
- Assignment 10, Continued
- Assignment 10, Continued
- Assignment 10, Continued
- Assignment 10, Continued
- Assignment 10, Continued
- Assignment 11
- Assignment 11, Continued
- Assignment 11, Continued
- Assignment 11, Continued
- Assignment 11, Continued
- Assignment 11, Continued
- Assignment 11, Continued
- Assignment 11, Continued
|