Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CORRECTIVE ACTION - DCBMIR
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
B   MIRROR   SELF   TEST   FAILURE
Up
TM-11-6625-3081-23-5 Electronic Equipment Test Facility TADS/PNVS Augmentation Equipment Manual
Next
CABLE  ASSEMBLY  (TARGET  LAMP)  2A1A2A11W19 7 -9 INPUT   CODE:   DCDCTL

TM  11-6625-3081-23 7-8.   B   MIRROR 7 -8 INPUT   CODE: DCBMIR   (cont) 2.   CORRECTIVE   ACTION   -   DCBMIR   (cont) (f) Remove Cable Assembly 2A1A2A1W48. Check  contacts  of  mating  connectors and repair if required. Install  replacement  2A1A2A1W48  and  perform DCBMIR test. If DCBMIR test passes,   no further action required. If DCBMIR  test  fails,  proceed  to  (g). (g) Remove Cable Assembly 2A1A2A1W49. Check  contacts  of  mating  connectors and repair if required. Install  replacement  2A1A2A1W49  and  perform DCBMIR test. If DCBMIR test passes,    no further action required. If DCBMIR test fails, proceed to (h). (h) Remove Cable Assembly 2A1A2A1W50. Check  contacts  of  mating  connectors and repair if required. Install  replacement  2A1A2A1W50  and  perform DCBMIR test. If DCBMIR test passes,   no further action required. If DCBMIR  test  fails,  proceed  to  (i). (i) Check the following cable assemblies and repair as required: W27 W28 W29 2A1W26 2A1W32 2A1A2W40 2A2W8 2A2W9 2A2W17 If any cable was repaired, perform DCAMIR test. If DCAMIR test passes, no further  action  required. If DCAMIR test fails and CALCST, PLLBUS, MTRXSW,  ADST,  DIGITST,  FPSST,  and  PPSST  have  been  performed,  repair  is beyond this level of maintenance. Next higher level of maintenance required. If no cables were repaired and CALCST, PLLBUS, MTRXSW, ADST, DIGITST, FPSST, and PPSST tests have been performed, repair is beyond this level of maintenance. Next  higher  level  of  maintenance  required. 7-44

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing