Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INSTALLATION (cont)
Up
TM-11-6625-3081-23-4 Electronic Equipment Test Facility TADS/PNVS Augmentation Equipment Manual
Next
INSTALLATION

TM  11-6625-3081-23 5-6. BASE ASSEMBLY REPAIR (cont) 5-6 NOTE Transport  retainers  should  be  placed in operational position with flat of washer against bracket. (37) Install two transport retainer  brackets  (9)  with six screws (7) and washers (8). Torque screws (7) to 50 ft-lb. (38) Install two studs (5) into base assembly (6). (39) Install two protective cups (4) with four screws (1), lockwashers (2), and washers (3). (40) Refer to 1 above and install protective skirts. (41) Refer to paragraph 5-7 and adjust base assembly. END OF TASK b. To replace isolator number 2, proceed as follows: REMOVAL (1) Refer to 2a above and perform steps 1 thru 9. (2) On isolator (1), tag and disconnect yellow tube (2) from tee fitting (3) and two natural tubes (4) from oppo- site tee fitting (5). (3) Tag and disconnect yellow tube (6) from isolator fitting  (7). 5-18

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing