Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: BLOWER ASSEMBLY 1A6 OR 1A12 REPAIR
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
INSTALLATION
Up
TM-11-6625-3081-23-4 Electronic Equipment Test Facility TADS/PNVS Augmentation Equipment Manual
Next
CAPACITOR  REPLACEMENT

TM  11-6625-3081-23 4-5. BLOWER ASSEMBLY 1A6 OR 1A12 REPAIR 4-5 This task covers replacement of: Para Item Para Item 1. Capacitor 2. Blower motor INITIAIL  SETUP Equipment  Conditions Tools power removed (para 2-24.1) Blower  assembly  removed 1/8 in hex head ball end wrench (para 2-34, steps 1-8) Shorting  probe FOLLOWUP Materials  (appendix  C) Blower  assembly  installation Lug nut (Item 31) (para 2-34, steps 17, 18) Masking tape (Item 45) Personnel  Required 39B ATE Repairer 1.  CAPACITOR  REPLACEMENT NOTE This procedure is used to replace the capacitor  contained  in  blower  assem- bly 1A6 (1) or 1A12 (1). REMOVAL WARNING A HIGH VOLTAGE CAPACITOR (4 uF, 370v) MUST BE DISCHARGED BEFORE WORKING  INSIDE  BLOWER  ASSEMBLIES 1A6 0R 1A12. SERIOUS INJURY CAN RESULT IF CAPACITOR  TERMINALS  ARE  TOUCHED BEFORE CAPACITOR IS DISCHARGED. IF SHOCK OCCURS, APPLY FIRST AID (FM  21-11). GET MEDICAL HELP AT ONCE. a. On  capacitor  (2),  slide  rubber grommet (3) away from capacitor terminals (4). 4-8 Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing