Click here to make tpub.com your Home Page

Page Title: Chapter 2. OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
IDENTIFICATION
Up
TM-55-4920-234-15 Tester Starter Torque Type B-1 PART NO. RT320-200 Manual
Next
Figure 5. Starter Torque Tester (Exploded View)

CHAPTER 2
OPERATING INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
hand carrying arm to test a starter for right-hand
7. GENERAL
rotation, and on the left-hand carrying arm to test for
left-hand rotation. Install the torquemeter as follows:
When received, the starter torque tester and
accessories are suitably protected with a moisture
resistant cover and are enclosed in a suitable wooden
(1) Place torquemeter (13, fig. 5) in position
crate.
on carrying arm (30) and base and frame
assembly (31).
8. UNPACKING
(2) Install upper pivot pin (15) through
carrying arm (30) and end of torquemeter
push rod (1, fig. 4).
It is essential that extreme care be exercised in opening
the crate to avoid damaging the instruments, controls,
and other components and accessories.
a. Carefully  remove  starter  torque  tester,
instruments, and accessories from shipping crate.
b. Remove moisture-resistant covers from starter
torque tester and accessories.
9. INSPECTION
After unpacking, inspect the starter torque tester
thoroughly to insure that no damage has been incurred
in shipment. Inspect the starter torque tester as follows:
a. Visually inspect tachometer (10, fig.  2) and
torquemeter (11) to ascertain there has been no damage
incurred during shipment.
b. Inspect starter torque tester for damaged or
broken parts.
c. Ascertain that all adapters, couplings, jaws, and
other accessories have been provided.
10. SERVICING
Clean the starter torque tester and accessories with dry
cleaning solvent, Federal Specification P-D-680.  No
other servicing is required.
11.
INSTALLATION OF SEPARATELY PACKED
COMPONENTS
a. Torquemeters. Three torquemeters (fig. 4) are
1. PUSHROD
3. MOUNTING SUPPORT
provided for the starter torque tester. The torquemeters
2. HYDRAULIC CAPSULE
4. TORQUEINDICATOR
are packed separately to protect them from possible
damage.
The three torquemeters are similar in
Figure 4. Torquemeter
construction and operating principle and vary only in
their operating range.  Each torquemeter operates in
compression; consequently, it is placed on the right-
5

Privacy Statement - Press Release - Copyright Information. - Contact Us