Click here to make tpub.com your Home Page

Page Title: Equipment Performance Checklist
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Cleaning
Up
TM-11-6625-599-12 Voltmeter Electronic AN/ USM-98A Manual
Next
Figure 5. Voltmeter, Electronic AN/USM-98A, tube location.

TM 11-6625-599-12
umn. When using the checklist in b b e l o w ,
3-11. Equipment Performance Checklist
follow each step in order. If the corrective
a. General. The equipment performance
m e a s u r e s indicated do not restore normal
checklist provides a procedure for systemati-
equipment performance, trouble-shooting is re-
cally checking equipment performance. All the
quired by higher category. Note on the repair
corrective measures that the repairman can per-
tag how the equipment performed and the cor-
form are given in the Corrective measures col-
rective measures that were taken.
b. Checklist.
Note: Perform the following with the polarity switch set to + (positive).
Caution: Do not rock or rotate a tube when
3-12. Replacement of Fuse
removing it from its socket: use a tube puller
If the vtvm is completely inoperative, the
and pull the tube straight out.
fuse is probably defective. Replace the defec-
a. General.  Before replacing any- tubes,
tive fuse with a new one. If the new fuse
blows when power is applied, higher level re-
check the power cord and fuses as the possible
pair is required. Replace the fuse as follows:
source of trouble. If the trouble is not found,
a. Turn the fuseholder cap on the rear panel
follow the instructions given in b and c below
counterclockwise to unlock the cap.
to check the tubes.
b. Pull out the fuseholder cap and the de-
b. Use of Tube Tester. Remove the two se-
fective fuse.
curing screws at the rear of the vtvm and pull
c. Remove the defective fuse and replace it
the chassis out of the case. Remove and test
with a new one.
one tube at a time. Discard a tube only if a
defect is obvious or the tube tester shows it to
Note:  A l-ampere fuse (cartridge type) is required
for 115-volt operation; a ½-ampere fuse (cartridge
be defective. Do not discard a tube that tests
type) is required for 230-volt operation.
at or near its minimum test limit. Replace the
original tube, or insert a new one of required.
3-13. Replacement of Tubes
before testing the next one.
c. Tube  Substitution Method.  Replace a
Warning: Tube OA2/WA contains radioac-
suspected tube with a new tube. If the equip-
tive material.  Handle carefully to avoid
ment still does not work, remove the new tube
breaking.
20

Privacy Statement - Press Release - Copyright Information. - Contact Us