Click here to make tpub.com your Home Page

Page Title: Chapter 7. ALIGNMENT PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Troubleshooting Chart
Up
TM-11-6625-539-15-2 Test Set Transistor TS-1836 B/U Manual
Next
Alignment of Test Set F.E.T. Position

TM 11-6625-539-15-2
ALIGNMENT PROCEDURES
7-1. General
Under normal conditions, the test set will maintain
the factory alignment over a long period of time. It
is necessary to realign the test set if any component
except the batteries is changed. Alignment procedures
are given in paragraphs 7-2 through 7-4.
7-2. Alignment of Meter Zero
a Set the polarity switch to OFF.
b. Adjust the meter zero adjustment screw located
directly below the base of the pointer for a 0 meter
indication.
7-3. Alignment of Meter OHMS Position
a. Test Equipment Required. The only test equip-
ment required is a 100-ohm, ±1 percent, ½-watt
resistor, FSN.
b. Procedure.
(1) Disconnect the unit from the case by remov-
ing the four front panel screws.
(2) Set the polarity switch to FWD PNP.
(3) Set the. function switch to OHMS E-B.
(4) Adjust resistor Rll (fig. 7-1) so that the
meter pointer indicates full scale on the OHMS scale.
Figure 7-1. Component location, board mounted.

Privacy Statement - Press Release - Copyright Information. - Contact Us